Real Estate Project Management Software in Jeddah

Real Estate Project Management Software in Jeddah for developers delivering seafront towers and family compounds. RealMake follows each project from design and permits through construction, inspections and snagging, with the full record kept on every building.

Real Estate Project Management Software in Jeddah, Obhur to Al Rawdah
200+ Real Estate Teams

What you get

  • Design revisions linked to the work they change
  • Inspection results logged on site with photos
  • Schedule impact of each change shown at once

Real Estate Project Management Software in Jeddah, Obhur to Al Rawdah

Jeddah projects often change shape while they are being built. A seafront tower on Al Shati may gain a revised facade, and a villa compound in Obhur may switch layouts after early buyers ask for changes. Without one record, those changes live in emails and the contractor builds from an old drawing. RealMake logs each design revision, links it to the affected work packages and shows the knock-on effect on the schedule. Inspectors on sites in Al Rawdah or Al Basateen record results on a tablet, and failed items return to the contractor with photos and a due date.

Book a Free Demo
0 + Projects Delivered
0 % Client Satisfaction
0 + Years of Experience
0 + Industries Served

RealMake modules for Jeddah developers

From the design stage to the last defect

Design stages

Design stages

Track concept, schematic and detailed design for each building, with review dates and the consultant responsible for each package.

Drawing register

Drawing register

Keep the current revision of every drawing and mark older ones as superseded, so site teams never build from an outdated sheet.

Permit tracker

Permit tracker

List the approvals each project needs, who is chasing them and the date expected, so construction does not start before the paperwork.

Change requests

Change requests

Record design changes with the reason, the cost and time effect and the person who approved them before work begins.

Package schedules

Package schedules

Plan structure, MEP, facade and finishes as separate packages with linked dates, so a late facade shows its effect on handover.

Quality checklists

Quality checklists

Use set inspection checklists for formwork, rebar, waterproofing and finishes, signed off by the engineer before work moves on.

Progress photos

Progress photos

Collect dated photos from site by floor and package, giving buyers' updates and consultant reviews the same evidence.

Defect tracking

Defect tracking

Log defects with location, photo and responsible trade, then follow each one until it is fixed and checked again.

Buyer handover

Buyer handover

Schedule handover appointments, record meter readings and keys issued, and keep the signed handover form on the unit.

Design changes that reach the site in time
Design changes that reach the site in time screenshot

Design changes that reach the site in time

Many Jeddah projects lose weeks when a revised drawing reaches the project office but not the contractor. RealMake treats each revision as a tracked change. The affected packages are flagged, the new drawing replaces the old one in the site register, and the planner sees the schedule effect before approving it. Inspectors check against the current revision, so rework caught at handover becomes rare.

  • Every revision tied to affected packages
  • Superseded drawings removed from site view
  • Time and cost effect shown before approval
  • Inspections checked against the latest sheet
See change control →

Moving a Jeddah project office onto RealMake

Six steps, with workshops in Jeddah and remote configuration

Discovery

Consultants meet your design, project and site teams in Jeddah to map how projects run today.

Templates

Inspection checklists, change forms and report layouts are agreed with your engineers.

Build

RealMake is set up in Bengaluru, and your team reviews each part in short online sessions.

Migration

Drawing registers, schedules and open defects are moved across and checked by the project office.

Training

Engineers, inspectors and planners are trained in English in Jeddah on a live building.

Live support

After go-live, support runs remotely in hours that overlap the Jeddah working day.

Delivering projects in Jeddah

Developers selling off-plan in Jeddah need a Wafi licence from REGA, and buyer money is held in an escrow account released against construction progress. A clear, approved progress record is therefore a cash matter as well as a site matter. RealMake keeps consultant approvals, photos and inspection results by milestone so the evidence is ready when a release is requested. Invoices raised to buyers at each milestone carry VAT at 15% and the Arabic fields ZATCA requires, and wave 25 of FATOORA brings firms above SAR 187,500 in VAT-subject revenue in any year from 2022 to 2025 into integration by 1 February 2027.

Wafi project milestones held against each building
Consultant approvals stored with dated photos
VAT at 15% on milestone invoices to buyers
FATOORA wave 25 deadline of 1 February 2027 covered

What Jeddah project teams get from Symake

Symake is a Bengaluru-based firm with 200+ projects delivered so far. Consultants come to Jeddah for discovery, training and go-live. Support is remote and in English, and India's working day overlaps most of the Saudi one.

✓ Drawing revisions under control
✓ Permits tracked per project
✓ Inspection checklists on tablets
✓ Change requests with approvals
✓ Dated photo record by floor
✓ Defects closed before handover
Plan a session
What Jeddah project teams get from Symake
200+ Projects Delivered

Keep your next Jeddah build on plan

Share a current project and we will map its design stages, packages and inspections in RealMake.

Frequently Asked Questions

Can RealMake track design changes on a Jeddah seafront tower?

Yes. Each change is logged with the drawing revision, reason, cost effect and approver. The affected packages are flagged so the contractor builds from the current design.

How does the system help with permits before construction starts?

Each project has a permit list with the responsible person and expected date. The schedule can hold construction activities until the required approvals are marked as received.

Do Jeddah buyers get progress updates from the project record?

Dated site photos and approved progress by building can be shared with your customer team, so updates to buyers in Obhur or Al Shati come from the same record the engineers use.

Do inspectors need a signal to record results on a Jeddah site?

Inspectors can fill in checklists on a tablet and attach photos. Results sync when the device reconnects, and each failed item goes to the contractor with a due date.

Which inspection checklists come with the system?

We start from common checklists for formwork, rebar, concrete, waterproofing, MEP and finishes, then adjust them to your own quality plan during the template workshops.

Can we keep the drawing register inside RealMake?

Yes. The register holds every sheet with its current revision. Superseded versions remain on file for reference but are hidden from site users.

How long does a typical Jeddah rollout take?

It depends on how many projects you bring and how much data moves across. We agree a plan after discovery and usually start with one building before adding the rest.

Who helps our Jeddah engineers once the system is live?

The Symake team in Bengaluru supports you remotely in English. Hours overlap most of the Saudi working day, and consultants can return to Jeddah for later phases.

Call us WhatsApp