Odoo Migration Services in Visakhapatnam

Odoo Migration Services in Visakhapatnam for firms upgrading an older Odoo database or leaving Tally and spreadsheets behind. Symake audits what you run today, moves it to Odoo 19 or 20, and shows matched ledgers, stock and receivables before anyone switches.

Odoo Migration Services in Visakhapatnam, checked line by line
200+ Projects Delivered

What you get

  • Keep, port or retire list for every module
  • Your own users test the upgraded copy
  • Trial balance and stock matched both sides

Odoo Migration Services in Visakhapatnam, checked line by line

Visakhapatnam promoters who trained as engineers tend to ask for the working, not just the answer, so the migration starts with evidence. Our consultants list every custom module, third-party app and scheduled action in the database your Dwaraka Nagar office runs today, and mark each one keep, port or retire. A copy of the upgraded database is then opened to your own users in Gajuwaka and Madhurawada, who post a normal week of entries and compare totals with the old system. Trial balance, stock valuation and the receivables ageing are matched before and after, and every difference is explained in writing. Only then do we fix a cut-over date, with a rollback plan that returns you to the old database if a check fails.

Talk to Our Team
0 + Projects Delivered
0 % Client Satisfaction
0 + Years of Experience
0 + Industries Served

What the Vizag migration covers

Nine pieces of work between the old system and Odoo 20

Database audit

Database audit

We read the current database, custom modules and third-party apps, and write down what each one does and who still uses it.

Target version choice

Target version choice

Odoo 18, 19 and 20 are the versions Odoo still covers, so we compare them against your modules and pick one in writing.

Custom code porting

Custom code porting

Modules that still matter are rewritten for the new version, while those replaced by standard Odoo features are retired.

Upgraded test copy

Upgraded test copy

A full copy of the upgraded database is handed to your users so they can try their daily work before the live switch.

Master data cleanup

Master data cleanup

Duplicate contacts, unused products and old account codes are merged or archived so the new database starts clean.

Open balance transfer

Open balance transfer

Receivables, payables, bank and stock balances on the cut-over date are moved and agreed with your accountant.

Before and after match

Before and after match

Trial balance, stock value and ageing reports from both systems are put side by side, and each gap is explained.

Rehearsal run

Rehearsal run

The whole move is run once on a copy, timed and noted, so the real cut-over follows a script that has already worked.

Rollback plan

Rollback plan

If a check fails on the night, the old database stays ready and your team returns to it with nothing lost.

Why Vizag engineers can check our numbers
Why Vizag engineers can check our numbers screenshot

Why Vizag engineers can check our numbers

Symake has delivered more than 200 Odoo and Salesforce projects, and migrations taught us that a move is judged by the reports that come after it. Before work starts you get a written scope listing every module, app and data set, with the target version named. During the move, each reconciliation is saved as a signed sheet. If an item was missed in the audit, we tell you and quote it before touching it.

  • Written scope naming the target version
  • Signed sheet for each reconciliation
  • Missed items quoted before any work
  • One consultant leads the move throughout
See a sample scope →

Six stages of a Visakhapatnam move

From the first audit to the first week on Odoo 20

Audit

We list modules, apps, users and data volumes, and note anything that blocks an upgrade.

Plan

The target version, retired modules and cut-over window are agreed in a written scope.

Port

Custom modules are rewritten and tested against the new version on a separate copy.

User test

Your staff post a normal week of entries on the upgraded copy and report what differs.

Rehearse

The full move runs end to end so timings and checks are known before the real night.

Cut over

Live data moves, balances are matched, and the old database is kept ready for rollback.

Moving Visakhapatnam businesses onto current Odoo

Many Vizag groups run a head office near Dwaraka Nagar with a second company registered in Kakinada or Srikakulam, and the migration brings both into one Odoo database with separate books. Symake moves businesses in manufacturing, real estate, hotels, healthcare, FMCG, education, retail, and distribution and logistics, so the data patterns we meet are rarely new to us. GST on the new database follows Andhra Pradesh rules, e-way bill fields are checked against the Rs 50,000 intra-state and inter-state limit, and e-invoicing is tested for firms above Rs 5 crore turnover. Training on the new screens is given in Telugu.

Kakinada or Srikakulam companies in one database
Andhra Pradesh GST set up on the new version
E-way limit of Rs 50,000 checked on test bills
Telugu sessions on the screens that changed

What Vizag gets from a Symake migration

A move planned on paper, tested by your own people and matched to the rupee before go-live. If you plan to use Odoo Online after the move, note that it allows no custom code, so any modules you keep may need Odoo.sh or a server of your own.

✓ Module audit before any quote
✓ Odoo 19 or 20 as the target
✓ Users test the upgraded copy
✓ Ledgers matched before and after
✓ Rehearsal before the real night
✓ Rollback ready on cut-over
Plan my move
What Vizag gets from a Symake migration
200+ Projects Delivered

Move your Visakhapatnam books onto Odoo 20

Share your current version and module list, and we will send a written audit plan for the move.

Frequently Asked Questions

Our Vizag office is on Odoo 15 with our own server. Is that a small upgrade?

Not usually. Databases on Odoo 16 or older are best treated as a full project, because several versions of changes stack up. We audit first, then decide whether to upgrade the data or start a fresh database with clean opening balances.

Can staff in Gajuwaka test the new version while the old one stays live?

Yes. The upgraded copy runs separately, so staff in Gajuwaka or any other office can post test entries there while real work continues on the old database. Nothing they do on the copy touches your live books.

We also have a branch in Vijayawada. Does it move on the same night?

It can, if both branches share one database. Where they run separate databases, we usually move them one after the other so each cut-over has its own checks and its own rollback point.

Will Odoo upgrade our database for us?

If you hold an Odoo Enterprise subscription, Odoo's upgrade service handles the standard part of the database. Custom modules are outside that service, so Symake ports them and tests the result with the upgraded data.

What happens to reports our accountant built in the old system?

We list them in the audit. Many can be rebuilt with standard Odoo reports or filters, and the rest are recreated as custom reports and checked against the old figures.

Is Odoo 17 still a safe target?

No. Odoo 20 was released on 24 September 2026, and Odoo covers only the last three major versions, which are now 18, 19 and 20. Moving to 17 would leave you outside that window from the start.

What if the cut-over fails halfway?

The rollback plan is agreed before the night. The old database is kept untouched, so if a balance does not match or a key check fails, your team goes back to it and we fix the issue before trying again.

Do we need to move from Community to Enterprise at the same time?

Not necessarily. Some firms upgrade first and change edition later. Combining both saves one round of testing, but it also means more change for users at once, so we set out both options in the audit.

Call us WhatsApp